33kV Northwest Loop Phase I EPC Project

The 33kV Northwest Loop Phase I EPC Project, contracted by KELIN ENERGY at a world-class oilfield in the Middle East, has been successfully implemented. By integrating an advanced Gas Turbine Generato

The 33kV Northwest Loop Phase I EPC Project, contracted by KELIN ENERGY at a world-class oilfield in the Middle East, has been successfully implemented. By integrating an advanced Gas Turbine Generator (GTG) into the power grid, the project aims to fully replace the 11 original diesel generator sets at the Central Processing Facility 2 (CPF2). This initiative has successfully established a reliable and efficient main power supply network for CPF2, the TMC, and 13 well pads along the route.


As a comprehensive EPC turnkey project, the core deliverables encompass 42 km of overhead transmission lines, 7 km of OPGW, 33kV switchgear, PMS (Power Management System) upgrades, 48-core armored fiber optic cables, and large-cross-section (630mm²) high-voltage power cables.


Navigating complex on-site security and operational challenges, the project team strictly benchmarked against the highest international HSSE standards, enforced 100% compliance with "Life Saving Rules," and actively fulfilled local content commitments. The smooth execution of this project fully demonstrates KELIN ENERGY's mature capabilities and expertise in delivering complex power infrastructure EPC projects within the international oil and gas sector.

HOME
TEL
EMAIL
SERVICE